Reserve Your 2027
Maize Runner

Reserve Your 2027
Maize Runner

Reserve Your 2027
Maize Runner

Be among the first to access Upside Robotics. Place a CA $100 refundable deposit to secure priority access for the 2027 launch and join the first wave of early adopters.

Be among the first to access Upside Robotics. Place a CA $100 refundable deposit to secure priority access for the 2027 launch and join the first wave of early adopters.

RESERVE TODAY

CA $100 refundable deposit

A reservation is the first step toward securing your Upside Robotics Maize Runner 2027. You’ll finalize your order once production is ready and your configuration is confirmed.

By confirming my reservation, I acknowledge that I have read and agree to the Reservation Agreement, Upside Robotics Terms, Payment Terms, and Privacy Policy. Pricing, product availability, specifications, and final configuration are subject to change prior to manufacturing and delivery.

PRODUCT

Our first live-in field robot: Designed and built with top maize farmers

01

Compact, All-Season Design

22″ wide to fit between 30″ corn rows, enabling in-season application without crop damage.

02

Autonomous Refill System

50L / 13 gal tank that refills automatically at the base station when levels run low.

03

Long-Duration Power

10-hour battery life with a 60-minute full recharge for continuous operation.

04

High Field Coverage

Covers approximately 1 acre per hour, ideal for managing up to 100 acres per week.

05

Real-Time Crop Intelligence

Multiple onboard sensors for crop monitoring and real-time data insights.

SUPPORT

FAQs

01

Is the CA $100 deposit refundable?

Yes, your CA $100 deposit is fully refundable until you confirm your final order. We also leverage multiple sources of existing data (including satellite data, yield maps and swat maps) in combination with our own data autonomously collected from ground level. This data is continuously processed through advanced artificial intelligence algorithms to determine when and how much of the fertilizer needs to be applied on a per plant basis.

02

What does reserving a unit mean?

Reserving a unit secures your place in line for future availability of the Upside Robotics Maize Runner.

03

When will deliveries begin?

We are currently targeting 2027 for initial deliveries. Timing may evolve as development and production progress.

04

Do I need to complete a full purchase now?

No, this is only a reservation deposit, not a full purchase. You’ll have the opportunity to finalize your order later once production is ready and your configuration is confirmed.

05

Will the final product look exactly like the images shown?

Not necessarily. The images shown on this page are from a previous generation and are intended to represent the overall direction of the product. Your reservation will apply toward the newest generation of the Upside Robotics Maize Runner available at the time of production.

06

What happens after I reserve?

After placing your deposit, you’ll receive a confirmation and be added to the reservation list. We’ll keep you updated as we move closer to production and final order availability.

Built in the Field. Tested in the Dirt.

Copyright © 2026 Upside Robotics.

All rights reserved.

Website developed by Atravela

Built in the Field.

Tested in the Dirt.

Copyright © 2024 Upside Robotics.

All rights reserved.

Website developed by Atravela

Built in the Field. Tested in the Dirt.

Copyright © 2026 Upside Robotics.

All rights reserved.

Website developed by Atravela